and Steel Buildings Build and Buy Online!
Base ConditionEvery metal building has some type of base connection along the building perimeter, allowing the connection of sheeting. This "base condition" determines exactly how the panels connect to the foundation. To prevent water and pests from entering the building at the base, panels extend below the finished floor of the building. Online design and pricing systems allows users to choose from a number of different base options. Standard Base Angle - Our system defaults to a standard base angle condition. This condition consists of a single angle member, attached to both the wall sheets and the slab. Please note that the standard base condition requires that the slab be formed with a 1˝" sheet notch to allow the sheets to extend below the top of the slab. Deluxe Trim - Deluxe base trim is another option for buildings with concrete slab foundations. Deluxe base trim combines base angle and trim into one piece, providing all the benefits of base trim and base angle. Deluxe base trim is only available in burnished slate color. Base Girt - The base girt option is designed for buildings that sit on piers rather than a full slab. A base girt system does not rest on or attach to the foundation. The base girt attaches to clips on the columns about 6" above the foundation. The base girt provides a great connection for liner panel. Base Channel - The Base channel is a "cee" shaped section that runs the perimeter of the building connected to the floor. It is most commonly used when a liner panel, or interior wall, is going to be installed. The "cee" section provides a pre-positioned connection point for inside panels. This approach requires a sheet notch in the slab (for an alternative, see the combination of base channel and base trim below). Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Commercial BuildingsIt is said that close to 90% of all new commercial construction is a steel building system. The ease of construction makes a new steel building system more attractive to builders and owners alike. From carwashes to skyscrapers steel has, and will continue to lead the way. Steel buildings are great for workshops or manufacturing facilities, classrooms or church buildings, metal buildings are fast replacing less adaptable building systems. Today, more than ever our world is growing faster and more competitive. Architects and professional building designers are becoming more aware of the benefits of steel from a construction and economical standpoint. As new steel building systems are introduced, we see the bottom line improving on construction projects of all kinds. The ease of construction and versatility makes a steel building attractive for a variety of uses. Wall InstallationLabels on wall insulation rolls indicate the length as well as the number of pieces that need to be cut from each roll. We recommend that all rolls be cut from a clean location to avoid staining the insulation facing. 1) Cut the dimensions of the insulation from the base angle to eave strut or rake plus 6"-12" extra. 2) Attach one end of the insulation to the base angle using double-faced tape. 3) Pull from the other end to stretch the insulation tightly outside the girts to the eave or rake, and attach with double-faced tape. 4) Make sure the facing is toward the interior of the building and attach the panel to the structure. 5) Install the next roll in the same manner, with edges butted snugly. Then fasten the tabs using one of the methods described. InsulationUsed to assist in the retention of heat or cooling. White reinforced vinyl. The thickness options are 3", 4" and 6" which have an "R Value" of 10, 13 and 19 respectively. Thank you for visiting us. We provide the best service and prices when shopping for metal buildings or steel buildings. |